TRIUMF Beamline Controls System Drawing Upgrade/Updates
- Angel Manguerra

- Mar 7, 2018
- 1 min read
This longer duration project stretched all four months of my work term. It involved checking the vacuum system components on the beamline and updating any discrepancies. In some cases, I assisted in a complete re-design of sections of the beamline's vacuum controls.

This project involved much communication between the various groups who utilized difference sections of the vacuum beamline. It also required a general knowledge of various vacuum systems components (valves, gauges, roughing pumps, sniffers etc) and how to design them into a functioning vacuum controls system.


Comments